My Projects

1

Smart Home Application

April 2025 - Present

Smart Home application for a newly built building in Gdynia, integrating multiple devices with visualization on a tablet and web interface, providing remote access via the cloud.

Responsibilities:

  • Designed and implemented a Smart Home system with seamless integration of IoT devices.
  • Developed a user-friendly visualization accessible on tablets and web browsers.
  • Enabled secure remote access through cloud-based solutions.
2

AquaGen+ E-commerce Website

March 2025 - Present

E-commerce website for AquaGen Polska (aquagenpolska.pl), catering to the beauty industry.

Responsibilities:

  • Designed and developed a responsive e-commerce platform for AquaGen Polska.
  • Integrated payment gateways and optimized the website for user experience.
  • Ensured scalability and performance for high traffic.
3

Wireless Communication Integration for Power Generation

March 2025 - March 2025

Integration of wireless communication for power generation devices using photovoltaics, including Fronius inverters and smart meters, via LoRa technology.

Responsibilities:

  • Implemented LoRa-based communication for Fronius inverters and smart meters.
  • Optimized data transmission for real-time monitoring of photovoltaic power generation.
  • Ensured reliable and secure wireless communication for energy management.
4

BBC Vermont

Nov 2024 - Feb 2025

Main engineer and team leader for the repair of the ship's engine room after a fire in France. Responsible for creating the E&A automation package for the NK class classification society and commissioning automation, propulsion, and engine room systems.

Responsibilities:

  • Led the engineering team during the repair of the ship's engine room after a fire.
  • Prepared comprehensive E&A automation documentation for the NK class classification society.
  • Commissioned automation, propulsion, and engine room systems to ensure full operational readiness.
5

AquaGen+

April 2024

Hydrogen purification machine with advanced technology and embedded systems integration.

Responsibilities:

  • Developed an interactive touch panel visualization for efficient operation and monitoring.
  • Supported the integration of embedded solutions to enhance system functionality and performance.
6

OpenCPLC

Feb 2024 - Present

The OpenCPLC project provides a middleware layer between your application and microcontroller peripherals.

Responsibilities:

  • Designed and implemented the Uno STM32 PLC for small and medium-sized automation projects.
  • Focused on programming tasks for enhanced functionality and efficiency.
7

ORP Grom

Jan 2023 - Present

Missile ship and the third and final vessel of the Orkan class, serving in the Polish Navy

Responsibilities:

  • Created a Dockerized asynchronous API for CRUD operations on SQL databases using FastAPI, Uvicorn, SQLModel, SQLAlchemy, Alembic, and Poetry.
  • Designed and implemented dynamic PowerApps intelligent Dataverse IO list for scalable integration of ship automation data.
8

R&D - Marine Engine Room Energy Efficiency System

Mar 2021 - Dec 2023

R&D project focused on an intelligent, integrated system for energy-saving operation of the ship's engine room.

Responsibilities:

  • Developed an energy-efficient program for motor control, certified by PRS
  • Developed a scalable Integrated Automation and Control Management System (IACMS) structure for PLCs, SCADA, and API/database integration.
9

266 - ORP Arctowski

Oct 2020 - Jul 2022

Survey ship of the Polish Navy.

Responsibilities:

  • Designed and programmed Integrated Automation and Control Management Systems (IACMS) using PLCs and SCADA technology.
10

511 - ORP Xawery Czernicki

May 2020 - Oct 2020

A mine countermeasure forces command vessel of the Polish Navy.

Responsibilities:

  • Programmed various applications for Integrated Automation and Control Management Systems (IACMS) in PLCs and HMIs
11

NB7070 - RV Atair

Jan 2020 - May 2020

RV Atair is a research vessel owned and operated by the Federal Maritime and BSH.

Responsibilities:

  • Designing and programming automated lighting management system for Wheelhouse Area
12

B774 - Honfleur

Dec 2017 - Apr 2020

RoRo Passenger Ship NB-774 with an electric propulsion and powered by LNG.

Responsibilities:

  • Designing and programming advanced automated lighting management system for Pax Areas
  • Designing cutting-edge LV electrical distribution systems for various applications
  • Leading an engineering team
  • Coordinating production both remotely and on-site
13

B372 - NKT Victoria

Jul 2015 - May 2017

Cable Laying Vessel (CLV) with hull no. B372, built in Kleven Shipyard, Norway. Elected as the Ship of the Year 2017.

Responsibilities:

  • Prepared comprehensive small power drawings, ensuring precise electrical layouts.
  • Efficiently coordinated cable pulling activities using specialized contriubuted software
  • Client and Shipyard liaison
14

621 - ORP Ślązak

Jun 2015 - Aug 2016

Polish patrol naval ship built at the Naval Shipyard in Gdynia, under PRS classification.

Responsibilities:

  • Preparing IO list for IACMS
  • Desigining electrical and automation drawings

Ready for technological advancement?
Feel free to reach out, and let's craft innovative solutions together for your project!

© 2025Marcin Taff